During the first winter a long long list of to do items, one by one was crossed off 2 years later its almost done, being i doing all work myself.

That summer off we went on our first long vacation in a long long time. (well deserved).  During out vacation more items was added to the to do list.

During the second winter a few items were x'd out.  Laid up with a bum back did get a new galley range installed, forced air furnace installed.  Old belching boiler removed piping & more wires (gads where does it all come from)  also installed a new washer & dryer, and converted a paint locker into a enclosure to hold 4 ten gallon propane tanks connecting the propane stove,furnace, and hot water  together via a common line according to abs standards all the way through.

The starting of summer a date was set August 15  underway planning to attend Harbor days in Olympia WA long rough trip along the cost (don't believe noaa)  Spent a full day in Neah bay re cooperating.  Arrived Thursday evening  Labor day weekend in Olympia,  Open house Saturday  we all had a wonderful time. Sunday noon Tugboat Races wouldn't you know 11 tugs along with the  ST-2130 oh well) decided just to run not race (49 year old engine ) ended up taking 3rd place.  Not bad I figure.

During that trip I decided to improve to much to slow steering system to electro hydraulic along with an auto pilot.   Its all most done. 


if you would like
to talk tug, or boat talk
you can email me at 
tugs_r_us@yahoo.com

stay tuned for further updates and photos

hope you have enjoyed the page
Captain Bruce

PAGE 1

PAGE 2